This fixes an issue where the contract court could leave a completely
swept commit tx unresolved if it was swept by the remote party.
This could happen if (our) commit tx just published was actually a
previously revoked state, in which case the remote party would claim the
funds via a justice transaction.
This manifested itself in the testRevokedCloseRetribution integration
test where at the end of the test Bob was left with a pending channel
that never resolved itself.
The message in the response stream changed. Rename the calls themselves,
to prevent older applications from getting decode errors. Especially
troublesome is the case where the request is executed (send payment),
but the application can't read the outcome (payment sent or not?)
This commit fixes the inconsistency between the payment state as
reported by routerrpc.SendPayment/routerrpc.TrackPayment and the main
rpc ListPayments call.
In addition to that, payment state changes are now sent out for every
state change. This opens the door to user interfaces giving more
feedback to the user about the payment process. This is especially
interesting for multi-part payments.
This commit removes the overflowQueue from the link. We do so in order
to promote better UX for senders, so that HTLCs are failed faster when
the commitment is full. This gives the sender the opportunity to try
another, more open path, rather than perceive the HTLC as being stuck.
At the same time, we remove the total number of active goroutines in lnd
by a factor of N where N is the number of active channels.
This is mainly motivated by a now fixed bug in the wallet in which
change addresses could at times be created outside of the default key
scopes. Recovery only used to be performed on the default key scopes, so
ideally this test case would've caught the bug earlier.
Move enum out of CloseSummary struct for more general use. This does
not change the encoding of the enum, and will only cause compile time
errors for existing clients. This enum has not been included in a
release yet, so we can make this move without much disruption.
In #4130, OpenChannel was changed to assert that the wallet is fully
synced before allowing a channel open. This introduced flakes on travis,
which are resolved here by using a wait predicate when calling
OpenChannel.
Note there is one existing call that was not converted, because it is
interested in the returned error. This call does not have a wait
predicate surrounding it, but this shouldn't cause a flake because other
channels are opened earlier in the test that will have already waited
for the wallet to sync up.
testSendToRouteMultiPath tests that we are able to successfully route a
payment using multiple shards across different paths, by using SendToRoute.
Co-authored-by: Joost Jager <joost.jager@gmail.com>
In preparation for MPP we return the terminal errors recorded with the
control tower. The reason is that we cannot return immediately when a
shard fails for MPP, since there might be more shards in flight that we
must wait for. For that reason we instead mark the payment failed in the
control tower, then return this error when we inspect the payment,
seeing it has been failed and there are no shards in flight.
These tests exercise the different ways of sweeping a commitment, so
we'll cover the modified scripts used for anchor commitments and
spending the anchor itself by both parties.
Co-authored-by: Johan T. Halseth <johanth@gmail.com>
Fixes a subtle bug where the outer scope predErr was hidden when the
return value of findForceClosedChannel was stored in a newly
defined variable with the same name.
Start anchor sweep attempts immediately after the commitment transaction
has been published. This makes the anchor known to the sweeper and
allows the user to bump the fee on it to get their commitment
transaction confirmed in case the fee committed too is insufficient for
timely confirmation.
In this commit, we extend the current SCB recovery tests to also cover
the new anchor commitment type. We only add a single test that covers
the most common case to avoid needing to tests all cases for all
commitment types which is being done in a follow up PR.
The synchronous call to get all channel backups also include
channels that are pending at the moment of the call. A previous
commit added pending channels to the file based backup as well. So
this is the last backup method that needs to be adjusted to also
contain unconfirmed channels.
Update channel updates and subscription itest to check that close
initiator is appropriately set for cooperative and force closes for the
local and remote party.
This commit adds PendingOpenChannel to SubscribeChannelEvents stream in
the gRPC API.
This is useful for keeping track of channel openings that Autopilot does.
It can also be used for the non-initator side of a channel opening to keep
track of channel openings.
To ensure lnd is able to pick up an on-chain preimage properly after a
restart, we suspend Alice and check that the payment is listed correctly
as succeeded after a restart.
This change makes sure that all macaroons are stored in the same
folder. This makes it possible to use the lntest package in external
projects that use loop's lndclient library which currently assumes
that the admin macaroon and subserver macaroons are in the same sub
folder of lnd's data directory.
Integration tests in external projects might not have the same folder
structure as lnd does. Therefore we want to allow the path to the
lnd itest binary to be configurable.
When using the lntest package for itests in external projects, it
is necessary to access a harness node's configuration, for example
to get its data directory on disk. This commit exports that
configuration.
This commit constructs a helper closure assertAmountSent that can be
reused by other functions. The closure returns an error so that it can
be used with wait.NoError or the new wait.InvariantNoError. The latter
is added since the predicate could otherwise pass immediately for the
sphinx_replay_persistence tests, but change shortly after. It also
rounds out the wait package so that we offer all combinations of
predicate and no-error style waits.
This changes the HarnessNode structure to hold onto the client grpc
connection made during startup so that it can close it during shutdown.
This is needed because the grpc.Dial function spins a new goroutine that
attempts to maintain an open connection to the target endpoint and
without calling Close() in the connection while shutting down the node
we leak this goroutine to the rest of the tests.
Since CSV locked outputs specifies the first block where they are
allowed to be included, they can actually be added one block earlier
into the mempool.
This led to a flake, where the sweep tx was already in the mempool at
the time we mined the last block, causing the next mempool check to
fail.
This commit adds an itest assertion to check that a coop closed
channel's status is properly refelcted in list channels. We also fix a
race condition that prevented the rpc from being externally consistent
by marking the close sooner in the pipeline.
This changes TCP port selection in integration tests from being
sequential, based on the node ID to being sequential but tested before
assigment.
This should reduce the number of flaky tests that fail due to the port
already being used by another process in the CI server.
Refresh channel memory state whenever the short channel id is refreshed.
This is to make the in-memory channel consistent with the disk data.
Fixes#3765.