lnd.xprv/htlcswitch
Joost Jager f60e4b1e14
lnwire+htlcswitch: report height for invalid payment details failure
Extends the invalid payment details failure with the new accept height
field. This allows sender to distinguish between a genuine invalid
details situation and a delay caused by intermediate nodes.
2019-09-16 10:10:20 +02:00
..
hodl htlcswitch/hodl: switch from debug tag to dev 2018-10-05 13:04:45 +09:00
hop Merge pull request #3465 from cfromknecht/tlv-parsed-types 2019-09-09 05:42:03 -07:00
circuit_map.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
circuit_test.go multi: remove dead code 2019-09-10 17:21:59 +02:00
circuit.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
decayedlog_test.go htlcswitch/decayedlog_test: fix bug in gc unit test 2018-06-27 14:40:28 -07:00
decayedlog.go multi: fix dropped errors 2019-09-13 09:50:38 +02:00
failure.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
interfaces.go multi: use separate cltv expiry field from invoice 2019-09-04 19:20:19 +02:00
link_test.go multi: remove dead code 2019-09-10 17:21:59 +02:00
link.go lnwire+htlcswitch: report height for invalid payment details failure 2019-09-16 10:10:20 +02:00
linkfailure.go htlcswitch/linkfailure: define LinkFailureError 2018-05-25 06:58:18 +02:00
log.go htlcswitch/hop: fix logging 2019-09-09 13:52:35 +02:00
mailbox_test.go htlcswitch/mailbox_test: add orchestrator pending/live test 2018-05-09 16:07:52 -07:00
mailbox.go multi: remove dead code 2019-09-10 17:21:59 +02:00
mock.go multi: remove dead code 2019-09-10 17:21:59 +02:00
packet.go multi: remove dead code 2019-09-10 17:21:59 +02:00
payment_result_test.go routing: Fix dropped errors in tests. 2019-09-13 06:28:05 +00:00
payment_result.go htlcswitch/payment_result: add paymentResultStore 2019-06-07 16:53:32 +02:00
queue_test.go htlcswitch: Remove obsolete fields from htlcPacket. 2017-12-14 17:53:58 -08:00
queue.go htlcswitch: ensure the packet queue exits on stop 2018-06-08 13:51:37 -07:00
sequencer.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
switch_test.go lnwire+htlcswitch: report height for invalid payment details failure 2019-09-16 10:10:20 +02:00
switch.go multi: remove dead code 2019-09-10 17:21:59 +02:00
test_utils.go routing: Fix dropped errors in tests. 2019-09-13 06:28:05 +00:00