lnd.xprv/htlcswitch
Joost Jager c6f9517e48
lnwire+htlcswitch: only use references for failure messages
Methods on failure message types used to be defined on value receivers.
This allowed assignment of a failure message to ForwardingError both as
a value and as a pointer. This is error-prone, especially when using a
type switch.

In this commit the failure message methods are changed so that they
target pointer receivers.

Two instances where a value was assigned instead of a reference are
fixed.
2019-07-11 19:49:47 +02:00
..
hodl htlcswitch/hodl: switch from debug tag to dev 2018-10-05 13:04:45 +09:00
circuit_map.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
circuit_test.go multi: update to go 1.11 gofmt 2018-10-07 14:37:38 +09:00
circuit.go multi: fix various typos in comments 2018-09-07 06:51:49 +02:00
decayedlog_test.go htlcswitch/decayedlog_test: fix bug in gc unit test 2018-06-27 14:40:28 -07:00
decayedlog.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
failure.go htlcswitch+routing: make error decryption mockable 2019-07-11 10:37:28 +02:00
interfaces.go htlcswitch/interface: add TowerClient iface 2019-06-13 19:54:17 -07:00
iterator.go multi: sort import paths with gofmt 2018-08-02 18:20:49 -07:00
link_test.go htlcswitch/switch: use paymentResultStore to keep track of results 2019-06-07 16:53:32 +02:00
link.go lnwire+htlcswitch: only use references for failure messages 2019-07-11 19:49:47 +02:00
linkfailure.go htlcswitch/linkfailure: define LinkFailureError 2018-05-25 06:58:18 +02:00
log.go multi: init subsystem loggers via build pkg 2018-10-05 13:04:45 +09:00
mailbox_test.go htlcswitch/mailbox_test: add orchestrator pending/live test 2018-05-09 16:07:52 -07:00
mailbox.go multi: replace manual CAS with sync.Once in several more modules 2019-06-12 09:37:26 -03:00
mock.go htlcswitch: use distinct error for unreadable failures 2019-07-11 19:49:45 +02:00
packet.go htlcswitch: for UpdateFailMalformedHTLC packets mark fail as needing conversion 2019-04-30 20:13:34 -07:00
payment_result_test.go htlcswitch/payment_result_test: add TestNetworkResultStore 2019-06-07 16:53:33 +02:00
payment_result.go htlcswitch/payment_result: add paymentResultStore 2019-06-07 16:53:32 +02:00
queue_test.go htlcswitch: Remove obsolete fields from htlcPacket. 2017-12-14 17:53:58 -08:00
queue.go htlcswitch: ensure the packet queue exits on stop 2018-06-08 13:51:37 -07:00
sequencer.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
switch_test.go htlcswitch: use distinct error for unreadable failures 2019-07-11 19:49:45 +02:00
switch.go lnwire+htlcswitch: only use references for failure messages 2019-07-11 19:49:47 +02:00
test_utils.go multi: make GetPaymentResult take payment hash 2019-06-07 16:53:32 +02:00