lnd.xprv/htlcswitch
Olaoluwa Osuntokun 4b65aea306
watchtower+htlcswitch: update client tower logic to recognize safu commitments
In this commit, we update the tower+link logic to tag a commitment as
the new (tweakless) format if it applies. In order to do this, the
BackupTask method has gained an additional parameter to indicate the
type of commitment that we're attempting to upload. This new tweakless
bool is then threaded through all the way to back up task creation to
ensure that we make the proper input.Input.

Finally, we've added a new test case for each existing test case to test
each case w/ and w/o the tweakless modifier.
2019-09-25 18:25:55 -07:00
..
hodl htlcswitch/hodl: switch from debug tag to dev 2018-10-05 13:04:45 +09:00
hop Merge pull request #3465 from cfromknecht/tlv-parsed-types 2019-09-09 05:42:03 -07:00
circuit_map.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
circuit_test.go multi: remove dead code 2019-09-10 17:21:59 +02:00
circuit.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
decayedlog_test.go htlcswitch/decayedlog_test: fix bug in gc unit test 2018-06-27 14:40:28 -07:00
decayedlog.go multi: fix dropped errors 2019-09-13 09:50:38 +02:00
failure.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
interfaces.go watchtower+htlcswitch: update client tower logic to recognize safu commitments 2019-09-25 18:25:55 -07:00
link_test.go multi: update internals to support updating max htlc 2019-09-23 13:07:10 +02:00
link.go watchtower+htlcswitch: update client tower logic to recognize safu commitments 2019-09-25 18:25:55 -07:00
linkfailure.go watchtower+htlcswitch: update client tower logic to recognize safu commitments 2019-09-25 18:25:55 -07:00
log.go htlcswitch/hop: fix logging 2019-09-09 13:52:35 +02:00
mailbox_test.go htlcswitch/mailbox_test: add orchestrator pending/live test 2018-05-09 16:07:52 -07:00
mailbox.go multi: remove dead code 2019-09-10 17:21:59 +02:00
mock.go multi: move active/inactive ntfns from switch to link 2019-09-19 12:46:44 -07:00
packet.go multi: remove dead code 2019-09-10 17:21:59 +02:00
payment_result_test.go routing: Fix dropped errors in tests. 2019-09-13 06:28:05 +00:00
payment_result.go htlcswitch/payment_result: add paymentResultStore 2019-06-07 16:53:32 +02:00
queue_test.go htlcswitch: Remove obsolete fields from htlcPacket. 2017-12-14 17:53:58 -08:00
queue.go htlcswitch: ensure the packet queue exits on stop 2018-06-08 13:51:37 -07:00
sequencer.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
switch_test.go lnwire+htlcswitch: report height for invalid payment details failure 2019-09-16 10:10:20 +02:00
switch.go routing+discovery: extract local channel manager 2019-09-23 13:07:08 +02:00
test_utils.go multi: update funding workflow to be aware of new tweakless commits 2019-09-25 18:25:46 -07:00