lnd.xprv/htlcswitch
2019-12-20 12:59:56 +02:00
..
hodl htlcswitch/hodl: switch from debug tag to dev 2018-10-05 13:04:45 +09:00
hop record: move CustomRecordSet 2019-12-12 00:12:19 +01:00
circuit_map.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
circuit_test.go multi: remove dead code 2019-09-10 17:21:59 +02:00
circuit.go htlcswitch: move hop iterator into htlcswitch/hop package 2019-09-05 15:30:31 +02:00
decayedlog_test.go peer+lnpeer: add new methods to expose local+global features for lnpeer interface 2019-09-25 18:26:01 -07:00
decayedlog.go multi: fix dropped errors 2019-09-13 09:50:38 +02:00
failure.go htlcswitch: report failure source index for forwarding errors 2019-11-12 14:13:29 +01:00
interfaces.go mutli: rename HodlEvent to HtlcResolution 2019-12-20 12:58:07 +02:00
link_isolated_test.go htlcswitch/test: add test cases that triggers empty commit sig 2019-11-06 09:21:21 +01:00
link_test.go multi: distinguish between htlc in and out constraints 2019-12-11 00:16:57 +01:00
link.go link+contractcourt: rename processHodlEvent to processHtlcResolution 2019-12-20 12:59:56 +02:00
linkfailure.go watchtower+htlcswitch: update client tower logic to recognize safu commitments 2019-09-25 18:25:55 -07:00
log.go htlcswitch/hop: fix logging 2019-09-09 13:52:35 +02:00
mailbox_test.go htlcswitch/mailbox_test: add orchestrator pending/live test 2018-05-09 16:07:52 -07:00
mailbox.go multi: remove dead code 2019-09-10 17:21:59 +02:00
mock.go mutli: rename HodlEvent to HtlcResolution 2019-12-20 12:58:07 +02:00
packet.go multi: remove dead code 2019-09-10 17:21:59 +02:00
payment_result_test.go routing: Fix dropped errors in tests. 2019-09-13 06:28:05 +00:00
payment_result.go multi: fix canceled spelling 2019-10-03 17:27:36 +02:00
queue_test.go htlcswitch: Remove obsolete fields from htlcPacket. 2017-12-14 17:53:58 -08:00
queue.go htlcswitch: ensure the packet queue exits on stop 2018-06-08 13:51:37 -07:00
sequencer.go multi: switch from bolt packge to bbolt package for all imports 2018-11-29 20:33:49 -08:00
switch_test.go htlcswitch: fix returned failure for insufficient balance 2019-10-23 09:57:34 +02:00
switch.go multi: Use user provided close address for cooperative closes 2019-12-10 09:13:01 +02:00
test_utils.go multi: distinguish between htlc in and out constraints 2019-12-11 00:16:57 +01:00