In this commit, we remove a ton of unnecessary indentation in the
processRemoteAdds method. Before this commit, we had a switch statement
on the type of the entry. This was required before when the method was
generic, but now since we already know that it’s an Add, we no longer
require such a statement.
In this commit, we remove the DecodeHopIterator method from the
ChannelLinkConfig struct. We do this as we no longer use this method,
since we only ever use the DecodeHopIterators method now.
In this commit, we fix a bug that was uncovered by the recent change to
lnwire.MilliSatoshi. Rather than manually compute the diff in fees,
we’ll directly compare the fee that is given against the fee that we
expect.
In this commit, we extend the switch as is, to record details
concerning settled payment circuits. To do this, we introduce a new
interface to the package: the ForwardingLog. This is a tiny interface
that simply lets us abstract away the details of the storage backing of
the forwarding log.
Each time we receive a successful HTLC settle, we’ll log the full
details (chans, fees, time) as a pending forwarding log entry. Every 15
seconds, we’ll then batch flush out these entries to disk. When we’re
exiting, we’ll try to flush out all entries to ensure everything gets
recorded to disk.
We’ll need this value within the link+switch in order to fully populate
the forwarding event that will be generated if this HTLC circuit is
successfully completed.
In this commit, we add the incoming+outgoing amounts if the HTLC’s that
the payment circuit consists of. With these new fields, we’ll be able
to populate the forwarding event log once the payment circuit has been
successfully completed.
This commit fixes a deadlock scenario caused when some
switch methods are waiting for a response on the
command's done/err chan. However, no such response will
be delivered if the main event loop has already exited.
This is resolved by selecting on the command's done/err chan
and the server's quit chan simultaneously.
In this commit, we fix an existing bug that would result in some
payments getting “stuck”. This would happen if one side restarted
before the channel was fully locked in. In this case, since upon
re-connection, the link will get added to the switch with a *short
channel ID of zero*. If A then tries to make a multi-hop payment
through B, B will fail to forward the payment, as it’ll mistakenly
think that the payment originated from a local-subsystem as the channel
ID is zero. A short channel ID of zero is used to map local payments
back to their caller.
With fix this by allowing the funding manager to dynamically update the
short channel ID of a link after it discovers the short channel ID.
In this commit, we fix a second instance of reported “stuck” payments
by users.
This commit updates the tests for checking a links Bandwidth()
calculation, after the change that made us use the remoteACKedIndex
instead of the logIndex when calculating it. The main result of this
change is that we never consider incoming updates before they are
acked, when calculating the bandwidth. This is because this was
inconsistent with the state we actually end up signing later on.
This commit introduces a new Ticker interface, that can be used
to control when the batch timer should tick. This is done to be
able to more easily control the ticker during tests. The batch
timer is wrapped in the new BatchTicker struct, and made part
of the config together with BatchSize.
In this commit, we add 6 new integration tests to test the various
actions that may need to be performed when either side goes on-chain to
fully resolve HTLC’s. Many of the tests are mirrors of each other as
they test sweeping/resolving HTLC’s from both commitment transactions.
In this commit, we update the failure case within handleLocalDispatch
to handle locally sourced resolutions. This is the case that we send a
payment out, but before it can even get past the first hop, we need to
go to chain (may have been a cascading failure). Once the HTLC is fully
resolved, we’ll send back a resolution message, however, that message
doesn’t have a failure reason populated. To properly handle this, we’ll
send back a permanent channel failure to the router.
In this commit, we address a lingering TODO: before this if we had a
set of HTLC’s that we knew the pre-image to on our commitment
transaction after a restart, then we wouldn’t attempt to settle them.
With this new change, we’ll check that we didn’t already retransmit the
settles for them, and check the preimage cache to see if we already
know the preimage. If we do, then we’ll immediately settle them.
In this commit, we add some additional logic to the case when we
receive a pre-image from an upstream peer. We’ll immediately add it to
the witness cache, as an incoming HTLC might be waiting on-chain to
fully resolve the HTLC with knowledge of the newly discovered
pre-image.
In this commit, we add a new method: ProcessContractResolution. This
will be used by entities of the contract court package to notify us
whenever they discover that we can resolve an incoming contract
off-chain after the outgoing contract was fully resolved on-chain.
We’ll take a contractcourt.ResolutionMsg and map it to the proper
internal package so we can fully resolve an active circuit.
Before this commit, if the htlcManager unexpectedly exited (due to a
protocol error, etc), the underlying block epoch notification intent
that was created for it would never be cancelled. This would result in
tens, or hundreds of goroutine leaks as the client would never consume
those notifications.
To fix this, we move cancellation of the block epoch intent from the
Stop() method of the channel link, to the defer statement at the top of
the htlcManager.
In this commit, we add an additional case when handling a failed
commitment signature. If we detect that it’s a InvalidCommitSigError,
then we’ll send over an lnwire.Error message with the full details. We
don’t yet properly dispatch this error on the reciting side, but that
will be done in a follow up a commit.
In this commit, we fix a lingering protocol level bug when reporting
errors encountered during onion blob processing. The spec states that
if one sends an UpdateFailMalformedHtlc, then the error reason MUST
have the BadOnion bit set. Before this commit, we would return
CodeTemporaryChannelFailure. This is incorrect as this doesn’t have the
BadOnio bit set.
In this commit, we modify the way the link handles HTLC’s that it
detects is destined for itself. Before this commit if a payment hash
came across for an invoice we’d already settled, then we’d gladly
accept the payment _again_. As we’d like to enforce the norm that an
invoice is NEVER to be used twice, this commit modifies that behavior
to instead reject an incoming payment that attempts to re-use an
invoice.
Fixes#560.
This commit fixes a lingering bug that could at times cause
incompatibilities with other implementations when attempting a
cooperative channel close. Before this commit, we would use a pointer
to the funding txin everywhere. As a result, each time we made a new
state, or verified one, we would modify the sequence field of the main
txin of the commitment transaction. Due to this if we updated the
channel, then went to do a cooperative channel closure, the sequence of
the txin would still be set to the value we used as the state hint.
To remedy this, we now copy the txin each time when making the
commitment transaction, and also the cooperative closure transaction.
This avoids accidentally mutating the txin itself.
Fixes#502.
This simplifies the pending payment handling code because it allows it
be handled in nearly the same way as forwarded HTLCs by treating an
empty channel ID as local dispatch.
The src/dest terminology for routing packets is kind of confusing
because the source HTLC may not be the source of the packet for
settles/fails traversing the circuit in the opposite direction. This
changes the nomenclature to incoming/outgoing and always references
the HTLCs themselves.
Previously, some methods on a LightningChannel like SettleHTLC and
FailHTLC would identify HTLCs by payment hash. This would not always
work correctly if there are multiple HTLCs with the same payment hash,
so instead we change these methods to identify HTLCs by their unique
identifiers instead.
This changes the circuit map internals and API to reference circuits
by a primary key of (channel ID, HTLC ID) instead of paymnet
hash. This is because each circuit has a unique offered HTLC, but
there may be multiple circuits for a payment hash with different
source or destination channels.
The constructor functions have no additional logic other than passing
function parameters into struct fields. Given the large function
signatures, it is more clear to directly construct the htlcPacket in
client code than call a function with lots of positional arguments.
In this commit, we modify the existing logic to handle
UpdateFailMalformedHLTC message from an incoming peer. Rather than fail
the Chanel if they give us an invalid failure code, we’ll instead treat
it as a temporary channel failure so we can continue to forward the
error.
This commit is a follow up to a prior commit which skipped sending the
commitment sig message (and sending out the update fee) message if the
channel wasn’t yet able to forward any HTLC’s. We’ll modify the prior
commit to not add the fee update to the channel at all. Otherwise, we
risk a state desynchronization.
This commit adds a check to `updateChannelFee` which skipssending the
`update_fee` message when the channel is not eligable for forwarding
messages (likely due to the channel's `RemoteNextRevocation` not yet
being set).
This addresses #470.
This commit fixes an existing bug wherein we would incorrectly attempt
to forward and HTLC to a link that wasn’t yet eligible for forwarding.
This would occur when we’ve added a link to the switch, but haven’t yet
received a FundingLocked message for the channel. As a result, the
channel won’t have the next revocation point available. A logic error
prior to this commit would skip tallying the largest bandwidth rather
than skipping examining the link all together.
Fixes#464.
In this commit, when selecting a candidate link to forward a payment,
we’ll ensure that it’s actually able to take on the HTLC. Otherwise,
we’ll skip over the link itself. Currently, a link is only fully
eligible for forwarding, *after* we’ve received and fully processed the
FundingLocked message.
In this commit, we add a new method to the ChanneLink interface:
EligibleToForward. This method allows a link to be added to the switch,
but in an intermediate state which indicates that it isn’t yet ready to
forward any incoming HTLC’s.
In this commit we add a new case to the main select statement within a
channel link. This select statement will serve as a Sipping Bird which
will check the network fee rate (as returned by the fee estimator) and
compare that to the fee on the commitment transaction. Using the
shouldAdjustCommitFee function, we determine if we should update the
commitment fee. If so, then we’ll send an UpdateFee message and also
trigger a new commitment update.
We also add a new unit test: TestChannelLinkUpdateCommitFee to ensure
that we update the fee accordingly if the fee increases or decreases by
a large portion.
In this commit, we add a new helper function to the link which will be
utilized in a later commit. This helper function will help us determine
if we should update the commitment fee, in response to a change in the
network fee return by our fee estimators.
In this commit we modify the primary InvoiceRegistry interface within
the package to instead return a direct value for LookupInvoice rather
than a pointer. This fixes an existing race condition wherein a caller
could modify or read the value of the returned invoice.
In this commit we add a quit case to the select statement that’s
entered once a link is created. Before this commit, upon restart it
would be possible that the deamon would never ben able to shutdown as
the link would be waiting for the messages to be sent by the other
side.
In this commit, we update getChanID to be aware of the FundingLocked
message as it will be retransmitted upon reconnect if both nodes think
that they’re at the very first commitment state.
In this commit, we’ve re-written the process of syncing the state of
channels after we reconnect. This re-write ensure correctness, and also
simplified the existing logic which would attempt to launch another
goroutine to handle requests from the switch to ensure that it doesn’t
block. This is no longer necessary as the AddPacket method that the
switch indirectly calls is non-blocking.
In this commit, we modify the existing implementation of the
Bandwidth() method on the default ChannelLink implementation to use
much tighter accounting. Before this commit, there was a bug wherein if
the link restarted with pending un-settled HTLC’s, and one of them was
settled, then the bandwidth wouldn’t properly be updated to reflect
this fact.
To fix this, we’ve done away with the manual accounting and instead
grab the current balances from two sources: the set of active HTLC’s
within the overflow queue, and the report from the link itself which
includes the pending HTLC’s and factors in the amount we’d need to (or
not need to) pay in fees for each HTLC.
In this commit, we’ve modified the link and the switch to start to use
the new mailBox in place of the existing synchronous message send
directly into the link’s upstream/downstream channels. With his change,
we no longer need to spawn a new goroutine each time an HTLC needs to
be forwarded, or a user payment is initiated.
In this commit, we add a new abstraction to the package: the mailBox.
The mailBox is a non-blocking, concurrent safe, in-order queue for
delivering messages to a given channelLink instance. With this
abstraction in place, we can now allow the switch to no longer launch a
new goroutine for each forwarded HTLC, or instantiated user payment.
After addition of the retransmission logic in the channel link, we
should make the onion blobs persistant, the proper way to do this is
include the onion blobs in the payment descriptor rather than storing
them in the distinct struct in the channel link.