In this commit, we remove the DecodeHopIterator method from the
ChannelLinkConfig struct. We do this as we no longer use this method,
since we only ever use the DecodeHopIterators method now.
This commit fixes a lingering bug that could at times cause
incompatibilities with other implementations when attempting a
cooperative channel close. Before this commit, we would use a pointer
to the funding txin everywhere. As a result, each time we made a new
state, or verified one, we would modify the sequence field of the main
txin of the commitment transaction. Due to this if we updated the
channel, then went to do a cooperative channel closure, the sequence of
the txin would still be set to the value we used as the state hint.
To remedy this, we now copy the txin each time when making the
commitment transaction, and also the cooperative closure transaction.
This avoids accidentally mutating the txin itself.
Fixes#502.
In this commit we add a new case to the main select statement within a
channel link. This select statement will serve as a Sipping Bird which
will check the network fee rate (as returned by the fee estimator) and
compare that to the fee on the commitment transaction. Using the
shouldAdjustCommitFee function, we determine if we should update the
commitment fee. If so, then we’ll send an UpdateFee message and also
trigger a new commitment update.
We also add a new unit test: TestChannelLinkUpdateCommitFee to ensure
that we update the fee accordingly if the fee increases or decreases by
a large portion.
In this commit we modify the primary InvoiceRegistry interface within
the package to instead return a direct value for LookupInvoice rather
than a pointer. This fixes an existing race condition wherein a caller
could modify or read the value of the returned invoice.
In this commit, we update getChanID to be aware of the FundingLocked
message as it will be retransmitted upon reconnect if both nodes think
that they’re at the very first commitment state.
In this commit BOLT№2 retranmission logic for the channel link have
been added. Now if channel link have been initialised with the
'SyncState' field than it will send the lnwire.ChannelReestablish
message and will be waiting for receiving the same message from remote
side. Exchange of this message allow both sides understand which
updates they should exchange with each other in order sync their
states.
This commit where added as a measure to avoid the panic during several
server simultanoius fault. The panic happened becuase *t.Testing
structure is not concurrent safe.
In this commit, we address a lingering TODO within the
TestUpdateForwardingPolicy test case to ensure that Bob will reject the
payment the second time around due to an update in his fee policy.
This commit renames the Deobfuscator interface to ErrorDecrypter and
the Obfuscator interface to ErrorEncrypter. With this rename, the
purpose of these two interfaces are a bit clearer.
Additionally, DecryptError (which was formerly Deobfuscate) now
directly returns an ForwardingError type instead of the
lnwire.FailureMessage.
This commit temporary increases the timeout for the
TestChannelLinkBidirectionalOneHopPayments test in order to account for
the slowness of the travis instances that our tests are run on.
Within the network, it's important that when an HTLC forwarding failure
occurs, the recipient is notified in a timely manner in order to ensure
that errors are graceful and not unknown. For that reason with
accordance to BOLT №4 onion failure obfuscation have been added.