In this commit, we add and enforce a min fee rate for commitment
transactions created, and also any updates we propose to the remote
party. It's important to note that this is only a temporary patch, as
nodes can dynamically raise their min fee rate whenever their mempool is
saturated.
Fixes#1330.
This commit changes the decayed log tests to create
a new temporary database for each test. Previously, all
instances referenced the same db path. Since the tests
are run in parallel, the tests would create/delete the
shared db out from under each other, causing flakes in
the unit tests.
Adds a new closure OnChannelFailure to the link config, which is called
when the link fails. This function closure should use the given
LinkFailureError to properly force close the channel, send an error to
the peer, and disconnect the peer.
This commit introduces a new error type LinkFailureError which is used
to distinguish the different kinds of errors that we can encounter
during link operation. It encapsulates the information necessary to
decide how we should handle the error.
In this commit, we fix an existing source of a panic, that could at
times lead to a deadlock. If the circuit returned from closeCircuit
didn't have an outgoing key (as it was an incomplete forward), then we
would attempt to de-ref a nil pointer. This would trigger a panic, and
the runtime would start to unwind the stack, and execute each defer in
line. A deadlock can arise here, as in the defer at the root goroutine,
we need to grab the fwdingEventMtx. However, we already have it at the
panic site.
We fix this issue by ensuring we only attempt to add the event if it's a
_settle_ and also actually has an outgoing circuit (which it should
already, just a defensive check).
This commit adds a test where we trigger a situation which would
previously make the link think it was never in sync, and potentially
create a lot of empty state updates. This would happen if we were
waiting for a revocation, while still receiving updates from the remote.
Since in this case we could not ACK the updates because of the exhausted
revocation window, our local commitchain would extend, while the remote
chain would stall. When we finally got the revocation the local
commitment height would be far larger than the remote, and FullySynced
would return false from that point on.
This commit adds a new test that makes sure we don't try to send
commitments for states where there are now new updates. Before the
recent change to FullySynced we would do this in this test scenario, as
the local an remote commitment heights would differ.
The test makes the local commitment chain extend by 1 vs the remote,
which would earlier trigger another state update, and checks taht no
such state update is made.
This commit makes the call to forwardBatch after locking
in Adds synchronous. This ensures that circuits for any Add
packets are added to the switch in the same order that they
are prescribed in the channel state. Though it is very unlikely
this case would arise, it may happen under more greater loads.
In addition, this also makes some trivial optimizations wrt. to
not spawning unnecessary goroutines if no settle/fail packets
are locked in.
In this commit, we ensure that any time we send a TempChannelFailure
that's destined for a multi-hop source sender, then we'll always package
the latest channel update along with it.
In this commit, we fix a race in the set of TestChannelLinkTrimCircuits*
tests. Before this commit, we would trim the circuits in the htlcManager
goroutine. However, this was problematic as the scheduling order of
goroutines isn't predictable. Instead, we'll now trim the circuits in
the Start method.
Additionally, we fix a series of off-by-2 bugs in the tests themselves.
This commit inserts an initial set of HodlFlags into
their correct places within the switch. In lieu of the
existing HtlcHodl mode, it is been replaced with a
configurable HodlMask, which is a bitvector representing
the desired breakpoints. This will allow for fine grained
testing of the switch's internals, since we can create
arbitrary delays inside a otherwise asynchronous system.
In this commit, we update the testUpdateChannelPolicy to exercise the
recent set of changes within the switch. If one applies this test to a
fresh branch (without those new changes) it should fail. This is due to
the fact that before, Bob would attempt to apply the constraints of the
incoming link (which we updated) instead of the outgoing link. With the
recent set of changes, the test now properly passes.
In this commit, we fix the TestUpdateForwardingPolicy test case after
the recent modification in the way we handling validating constraints
within the link. After the recent set of changes, Bob will properly use
his outgoing link to validate the set of fee related constraints rather
than the incoming link. As a result, we need to modify the second
channel link, not the first for the test to still be applicable.