With the introduction of the max CLTV limit parameter, nodes are able to
reject HTLCs that exceed it. This should also be applied to path
finding, otherwise HTLCs crafted by the same node that exceed it never
left the switch. This wasn't a big deal since the previous max CLTV
limit was ~5000 blocks. Once it was lowered to 1008, the issue became
more apparent. Therefore, all of our path finding attempts now have a
restriction of said limit in in order to properly carry out HTLCs to the
network.
Extends the invalid payment details failure with the new accept height
field. This allows sender to distinguish between a genuine invalid
details situation and a delay caused by intermediate nodes.
This commit modifies paymentLifecycle so that it not only feeds
failures into mission control, but successes as well.
This allows for more accurate probability estimates. Previously,
the success probability for a successful pair and a pair with
no history was equal. There was no force that pushed towards
previously successful routes.
In this commit, we add a new field to the Hop proto to allow callers to
be able to specify TLV records for the SendToRoute call, and also to be
able to display TLV records that were used during regular path finding.
We also update SendPayment to support dest TLV records.
Previously mission control tracked failures on a per node, per channel basis.
This commit changes this to tracking on the level of directed node pairs. The goal
of moving to this coarser-grained level is to reduce the number of required
payment attempts without compromising payment reliability.
Align naming better with the lightning spec. Not the full name of the
failure (FailIncorrectOrUnknownPaymentDetails) is used, because this
would cause too many long lines in the code.
This commit upgrades the protobuf version. Compared to the previous
v1.2.0 it generates smaller diffs in generated code. This change was
introduced in:
fffb0f7828