Commit Graph

5 Commits

Author SHA1 Message Date
Olaoluwa Osuntokun
83bf0be2cc
test: introduce a few networkHarness helper methods
This commit adds some new networkHarness helper methods which are
mean’t to reduce the verbosity of the previous basic tests, and also to
enable developers to right tests mote easily five a higher level
interface.
2016-08-31 11:59:25 -07:00
Olaoluwa Osuntokun
62c426fe75
test: update the funding test to use new async updates/notifications
This commit increases the robustness of the current test and also
reduces it’s running time considerably as all “time.Sleep”s have now
been removed.

Rather than sleeping some random amount of time, the test now waits for
a particular async notification to be dispatched before proceeding.
This tightens up the execution of the tests quite a bit.
2016-08-30 19:36:48 -07:00
Olaoluwa Osuntokun
95380fee1b
test: add async txn seen notifications to network harness
This commit adds a new feature to the network harness enabling callers
to receive async notifications once a particular transaction is seen on
the network. Such a feature is useful when due to the asynchronous
behavior of node communications.

With this new feature, tests can now wait for a particular transaction
to be seen within the network before proceeding.
2016-08-30 19:34:25 -07:00
Olaoluwa Osuntokun
1ace7ede01
lnd: fix build for Go 1.6.3, refer to old context package
This commit fixes the build for version 1.6.3 of golang. In go 1.7, the
“context” package was moved into the standard library, however go 1.6.3
doesn’t have that change, so we must refer to the prior WIP package
until a new version of Go is released.
2016-08-30 11:12:38 -07:00
Olaoluwa Osuntokun
b21c8eccf0
lnd: add basic integration test using the networkHarness
This commit adds an initial integration test to the project which
exercises some basic channel opening/closing functionality between two
lnd nodes.
2016-08-29 22:08:00 -07:00