This commit makes the call to forwardBatch after locking
in Adds synchronous. This ensures that circuits for any Add
packets are added to the switch in the same order that they
are prescribed in the channel state. Though it is very unlikely
this case would arise, it may happen under more greater loads.
In addition, this also makes some trivial optimizations wrt. to
not spawning unnecessary goroutines if no settle/fail packets
are locked in.
In this commit, we ensure that any time we send a TempChannelFailure
that's destined for a multi-hop source sender, then we'll always package
the latest channel update along with it.
In this commit, we fix a race in the set of TestChannelLinkTrimCircuits*
tests. Before this commit, we would trim the circuits in the htlcManager
goroutine. However, this was problematic as the scheduling order of
goroutines isn't predictable. Instead, we'll now trim the circuits in
the Start method.
Additionally, we fix a series of off-by-2 bugs in the tests themselves.
This commit inserts an initial set of HodlFlags into
their correct places within the switch. In lieu of the
existing HtlcHodl mode, it is been replaced with a
configurable HodlMask, which is a bitvector representing
the desired breakpoints. This will allow for fine grained
testing of the switch's internals, since we can create
arbitrary delays inside a otherwise asynchronous system.
In this commit, we fix a very old, lingering bug within the link. When
accepting an HTLC we are meant to validate the fee against the
constraints of the *outgoing* link. This is due to the fact that we're
offering a payment transit service on our outgoing link. Before this
commit, we would use the policies of the *incoming* link. This would at
times lead to odd routing errors as we would go to route, get an error
update and then route again, repeating the process.
With this commit, we'll properly use the incoming link for timelock
related constraints, and the outgoing link for fee related constraints.
We do this by introducing a new HtlcSatisfiesPolicy method in the link.
This method should return a non-nil error if the link can carry the HTLC
as it satisfies its current forwarding policy. We'll use this method now
at *forwarding* time to ensure that we only forward to links that
actually accept the policy. This fixes a number of bugs that existed
before that could result in a link accepting an HTLC that actually
violated its policy. In the case that the policy is violated for *all*
links, we take care to return the error returned by the *target* link so
the caller can update their sending accordingly.
In this commit, we also remove the prior linkControl channel in the
channelLink. Instead, of sending a message to update the internal link
policy, we'll use a mutex in place. This simplifies the code, and also
adds some necessary refactoring in anticipation of the next follow up
commit.
In this commit, we fix a slight bug in lnd. Before this commit, we would
send the error to the remote peer, but in an async manner. As a result,
it was possible for the connections to be closed _before_ the error
actually reached the remote party. The fix is simple: wait for the error
to be returned when sending the message. This ensures that the error
reaches the remote party before we kill the connection.
In this commit, we relax the constraints on accepting an exit hop
payment a bit. We'll now accept any incoming payment that _at least_
pays the invoice amount. This puts us further inline with the
specification, which recommends that nodes accept overpayment by a
certain margin.
Fixes#1002.
In this commit, we remove a ton of unnecessary indentation in the
processRemoteAdds method. Before this commit, we had a switch statement
on the type of the entry. This was required before when the method was
generic, but now since we already know that it’s an Add, we no longer
require such a statement.
In this commit, we remove the DecodeHopIterator method from the
ChannelLinkConfig struct. We do this as we no longer use this method,
since we only ever use the DecodeHopIterators method now.
In this commit, we fix a bug that was uncovered by the recent change to
lnwire.MilliSatoshi. Rather than manually compute the diff in fees,
we’ll directly compare the fee that is given against the fee that we
expect.
In this commit, we fix an existing bug that would result in some
payments getting “stuck”. This would happen if one side restarted
before the channel was fully locked in. In this case, since upon
re-connection, the link will get added to the switch with a *short
channel ID of zero*. If A then tries to make a multi-hop payment
through B, B will fail to forward the payment, as it’ll mistakenly
think that the payment originated from a local-subsystem as the channel
ID is zero. A short channel ID of zero is used to map local payments
back to their caller.
With fix this by allowing the funding manager to dynamically update the
short channel ID of a link after it discovers the short channel ID.
In this commit, we fix a second instance of reported “stuck” payments
by users.
This commit introduces a new Ticker interface, that can be used
to control when the batch timer should tick. This is done to be
able to more easily control the ticker during tests. The batch
timer is wrapped in the new BatchTicker struct, and made part
of the config together with BatchSize.
In this commit, we add 6 new integration tests to test the various
actions that may need to be performed when either side goes on-chain to
fully resolve HTLC’s. Many of the tests are mirrors of each other as
they test sweeping/resolving HTLC’s from both commitment transactions.
In this commit, we address a lingering TODO: before this if we had a
set of HTLC’s that we knew the pre-image to on our commitment
transaction after a restart, then we wouldn’t attempt to settle them.
With this new change, we’ll check that we didn’t already retransmit the
settles for them, and check the preimage cache to see if we already
know the preimage. If we do, then we’ll immediately settle them.
In this commit, we add some additional logic to the case when we
receive a pre-image from an upstream peer. We’ll immediately add it to
the witness cache, as an incoming HTLC might be waiting on-chain to
fully resolve the HTLC with knowledge of the newly discovered
pre-image.
Before this commit, if the htlcManager unexpectedly exited (due to a
protocol error, etc), the underlying block epoch notification intent
that was created for it would never be cancelled. This would result in
tens, or hundreds of goroutine leaks as the client would never consume
those notifications.
To fix this, we move cancellation of the block epoch intent from the
Stop() method of the channel link, to the defer statement at the top of
the htlcManager.
In this commit, we add an additional case when handling a failed
commitment signature. If we detect that it’s a InvalidCommitSigError,
then we’ll send over an lnwire.Error message with the full details. We
don’t yet properly dispatch this error on the reciting side, but that
will be done in a follow up a commit.
In this commit, we modify the way the link handles HTLC’s that it
detects is destined for itself. Before this commit if a payment hash
came across for an invoice we’d already settled, then we’d gladly
accept the payment _again_. As we’d like to enforce the norm that an
invoice is NEVER to be used twice, this commit modifies that behavior
to instead reject an incoming payment that attempts to re-use an
invoice.
Fixes#560.